Tutor Quora

EVNT7051 Event Planning And Project Management

Academic Anxiety?

Get an original paper within hours and nail the task

156 experts online

Free Samples

EVNT7051 Event Planning And Project Management

.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}

EVNT7051 Event Planning And Project Management

0 Download15 Pages / 3,512 Words

Course Code: EVNT7051
University: The University Of Queensland

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Questions
As an Event Manager you are required to produce a complete event project plan for the event below:
Event: Television Awards Ceremony London
The aim of the report is to demonstrate the feasibility of the event both operationally and financially.

Answer:

Introduction
The chosen event is a music festival that is planned to be hosted in London, England. This festival is planned to be hosted for two days in a weekend and some of the world’s most popular music stars will be invited. In order to host this large scale festival successfully, it is important to develop a suitable event management plan that will follow a standard project management approach.
In this report, a detailed event plan has been developed for the proposed event that includes scope, schedule, budget and other important aspects of a project.
Background and Scope of the Event
This particular event is a music festival that is set to take place is London, England in September 2018. While the main purpose is to bring together a large number of famous and most reputed music artists within a grand stage, the event will also be used as a medium for community service that will include providing entertainment to people as well as donate significant amounts of sum to various charitable organizations like old age homes, orphanages, cancer hospitals and some war torn countries where millions of people are starving. The proposed event will be one of the largest music festivals in the whole world and it is expected a huge number of international music stars will take part in the festival.
The primary scope of this event is to host a large scale music festival at a suitable venue for maximum number of audience. Further scope of the project includes renting of Wembley Stadium for the music festival, arranging seats for allowing around 110,000 spectators in the festival, run the festival over two days in the weekend, inviting popular music stars from around the world and successfully hosting the festival with the best viewing experience, safety and security.
Event Objectives
The main objectives of the event are determined as follows.

To provide entertainment to people and music fans all around the world
To prepare a grand stage for music festival
To raise funds for donating to various old age homes, orphanages and some war torn countries around the world

Entertainment Activities
Since the main focus of this festival is to host music performances from world famous artists, the entertain activities will be based on music. However, keeping in mind the possible number of children taking part in the festival along with their family members, there will be activities for children in the festival as well. Furthermore, in addition to the entertainment activities and events, there will be stalls for food and drinks as well. The event authority also aims to provide maximum safety and security to all the spectators who will participant in this grand festival.
Target Audience
While the event will be hosted in London, England, the event management team aims to make it a global festival that will see the festival being participated by music fans from all around the world. There is no specific target audience for the event as this event has been planned for people of all age groups as well as from different professions including sportsmen, acting and others. While for the adult spectators, there will be the music festival run for two days in the weekend, there will children activity event in the Wembley practice ground where the children will be able enjoy during the festival team.
Event Deliverables
There are several deliverables of the event explained in the following points.
Overall Event Management Plan – In order to deliver such a global scale music festival, a detailed event management plan is necessary. Hence, it is important for the event manager to develop an event charter that will include as aspects of the project including scope, timeline, budget, risk management plan and others. On approval of this event management plan, the entire project will be approved in order to proceed further.
Development of Event Management Team – For hosting a global scale music festival, a huge amount of human resources is necessary. Again, for efficient handling of these human resources, specific teams are to be developed and the human resources are to be allocated to these teams based on their skills and competencies. The entire event management team will include volunteers, stage preparation team, marketing and promotions team, security team, safety and first aid team and others.
Selection of Venue – As per the initial discussions, the festival is set to be held in London, England. However, the exact venue of the festival has not yet been confirmed. The majority of the event management has voted for Wembley Stadium owing to its capacity and central location in the city but the Olympic Stadium has also been considered as an alternative. During the planning phase, a specific venue for the festival has to be selected so that suitable preparations can be made for the festival accordingly.
Preparations for Festival – Since this festival will be a global scale event, detailed preparations are necessary. These should include the decoration of the stadium, preparation of security systems for the festival, installing safety measures, booking 6 star hotels for the music stars and other VIPs participating in the festival, construction of food and drinks stalls, children entertainment areas and others. Finally, funding requirements are to be analysed and sponsors will be contracted for investing in the festival.
Invite Popular Musicians – For performing in the event, the team needs to invite a host of popular musicians around the world. The performances from the musicians will ensure the festival will be of global level and will attract a large number of spectators from around the world. However, inviting a large number of popular musicians will also significantly increase the overall budget for the event and hence, planning is to be done accordingly.
Execute the Festival – The final deliverable is to execute the event over a period of 2 days in a selected weekend. After all the preparations for the festival are complete, the event will be executed as per the plan. Moreover, steps should be taken to ensure safety and security of the musicians as well as the spectators so that every person inside the stadium has a great experience of the festival.
Project Management Tools and Techniques
The work breakdown structure for the project is shown in the following diagram.

Figure 1: Work Breakdown Structure of the Project
(Source: Created by Author)
The proposed schedule for the project is shown in the following table.

Task Name

Duration

Start

Finish

Predecessors

Music Festival in London

168 days

Mon 7/2/18

Wed 2/20/19

 

   Event Planning and Discussions Phase

42 days

Mon 7/2/18

Tue 8/28/18

 

      Initial Planning and Proposal of the Festival

15 days

Mon 7/2/18

Fri 7/20/18

 

      Get Appointment with Government

5 days

Mon 7/23/18

Fri 7/27/18

2

      Discussion with Government Regarding the Festival

5 days

Mon 7/30/18

Fri 8/3/18

3

      Get Approval for the Festival

2 days

Mon 8/6/18

Tue 8/7/18

4

      Analysis of the Feasibility of the Festival

5 days

Wed 8/8/18

Tue 8/14/18

5

      Prepare Festival Draft

5 days

Wed 8/15/18

Tue 8/21/18

6

      Go Ahead for the Festival

5 days

Wed 8/22/18

Tue 8/28/18

7

   Detailed Planning and Preparation

38 days

Wed 8/29/18

Fri 10/19/18

 

      Preparation of Event Charter

10 days

Wed 8/29/18

Tue 9/11/18

8

      Define Scope of the Event

2 days

Wed 9/12/18

Thu 9/13/18

10

      Determine Event Objectives

2 days

Fri 9/14/18

Mon 9/17/18

11

      Determine Number of Human Resources Required for Managing the Event

2 days

Tue 9/18/18

Wed 9/19/18

12

      Prepare Stakeholder and Human Resource Management Plan

2 days

Thu 9/20/18

Fri 9/21/18

13

      Develop Event Schedule

5 days

Mon 9/24/18

Fri 9/28/18

14

      Determine Budget for the Festival

5 days

Mon 10/1/18

Fri 10/5/18

15

      Analyse Risks of the Event

2 days

Mon 10/8/18

Tue 10/9/18

16

      Take Measures to Solve the Risks

2 days

Wed 10/10/18

Thu 10/11/18

17

      Prepare Communication Plan

2 days

Fri 10/12/18

Mon 10/15/18

18

      Finalize the Charter

2 days

Tue 10/16/18

Wed 10/17/18

19

      Get Approval for the Charter

2 days

Thu 10/18/18

Fri 10/19/18

20

   Marketing and Promotions

20 days

Mon 10/22/18

Fri 11/16/18

 

      Hire Marketing Team for the Event

3 days

Mon 10/22/18

Wed 10/24/18

21

      Start Marketing and Promotion of the Festival

10 days

Thu 10/25/18

Wed 11/7/18

23

      Invite Musicians to Perform in the Festival

5 days

Thu 11/8/18

Wed 11/14/18

24

      Invite High Profile Guests to Visit and Enjoy the Festival

2 days

Thu 11/15/18

Fri 11/16/18

25

   Project Execution

54 days

Mon 11/19/18

Thu 1/31/19

 

      Rent the Stadium for Festival

2 days

Mon 11/19/18

Tue 11/20/18

26

      Appoint Volunteers

3 days

Wed 11/21/18

Fri 11/23/18

28

      Decorate the Stadium with Lights and Banners

10 days

Mon 11/26/18

Fri 12/7/18

29

      Install Large Sound Boxes and Field Televisions

12 days

Mon 12/10/18

Tue 12/25/18

30

      Purchase Musical Instruments

5 days

Wed 12/26/18

Tue 1/1/19

31

      Prepare Parking Space

5 days

Wed 1/2/19

Tue 1/8/19

32

      Prepare Children Entertainment Area

5 days

Wed 1/9/19

Tue 1/15/19

33

      Build Food Stalls

2 days

Wed 1/16/19

Thu 1/17/19

34

      Build Drinks Stalls

2 days

Fri 1/18/19

Mon 1/21/19

35

      Build Souvenir Shops

2 days

Tue 1/22/19

Wed 1/23/19

36

      Install Safety System

2 days

Thu 1/24/19

Fri 1/25/19

37

      Construct Entry and Exit Routes

2 days

Mon 1/28/19

Tue 1/29/19

38

      Finalize the Project

2 days

Wed 1/30/19

Thu 1/31/19

39

   Event Execution and Closing

14 days

Fri 2/1/19

Wed 2/20/19

 

      Host the Festival

2 days

Fri 2/1/19

Mon 2/4/19

40

      Donate Funds Raised to Charity

5 days

Tue 2/5/19

Mon 2/11/19

42

      Review of the Festival

5 days

Tue 2/12/19

Mon 2/18/19

43

      Final Closing

2 days

Tue 2/19/19

Wed 2/20/19

44

The Gantt chart of the project is accordingly developed as follows.

Figure 2: Gantt Chart of the Project
(Source: Created by Author)
Project Team Management and Structure
Project team management is necessary in order to ensure all the stakeholders of the project understand and perform the roles and duties assigned to them. The appropriate structure for the project team for this festival will include the following stakeholders.

Stakeholder

Role

Event Manager

To manage and control the entire event

Human Resource Manager

To recruit human resource required for the festival

Marketing Manager

To promote the event for gathering maximum audience

Festival Supervisor

To supervise all the activities performed in the event

Budget for the Project
The budget for the project is divided in two parts – cost for human resources and cost for material resources. The usage rates of human resources are shown in the following table.

Resource Name

Type

Max. Units

Std. Rate

Ovt. Rate

Cost/Use

Accrue At

Base Calendar

Event Manager

Work

100%

£250.00/hr

£0.00/hr

£0.00

Prorated

Standard

Human Resource Manager

Work

100%

£150.00/hr

£0.00/hr

£0.00

Prorated

Standard

Marketing Manager

Work

100%

£100.00/hr

£0.00/hr

£0.00

Prorated

Standard

Festival Supervisor

Work

100%

£175.00/hr

£0.00/hr

£0.00

Prorated

Standard

Volunteers

Work

100%

£1,500.00/hr

£0.00/hr

£0.00

Prorated

Standard

Other Team Workers

Work

100%

£2,500.00/hr

£0.00/hr

£0.00

Prorated

Standard

Accordingly the budget for the project based on the rates of the human resources and using bottom up estimation is shown in the following table.

Task Name

Resource Names

Cost

Music Festival in London

 

£1,298,400.00

   Event Planning and Discussions Phase

 

£142,800.00

      Initial Planning and Proposal of the Festival

Event Manager, Festival Supervisor

£51,000.00

      Get Appointment with Government

Event Manager, Festival Supervisor

£17,000.00

      Discussion with Government Regarding the Festival

Event Manager, Festival Supervisor

£17,000.00

      Get Approval for the Festival

Event Manager, Festival Supervisor

£6,800.00

      Analysis of the Feasibility of the Festival

Event Manager, Festival Supervisor

£17,000.00

      Prepare Festival Draft

Event Manager, Festival Supervisor

£17,000.00

      Go Ahead for the Festival

Event Manager, Festival Supervisor

£17,000.00

   Detailed Planning and Preparation

 

£131,600.00

      Preparation of Event Charter

Event Manager, Festival Supervisor

£34,000.00

      Define Scope of the Event

Event Manager, Festival Supervisor

£6,800.00

      Determine Event Objectives

Event Manager, Festival Supervisor

£6,800.00

      Determine Number of Human Resources Required for Managing the Event

Event Manager, Festival Supervisor, Human Resource Manager

£9,200.00

      Prepare Stakeholder and Human Resource Management Plan

Event Manager, Festival Supervisor

£6,800.00

      Develop Event Schedule

Event Manager, Festival Supervisor

£17,000.00

      Determine Budget for the Festival

Event Manager, Festival Supervisor

£17,000.00

      Analyse Risks of the Event

Event Manager, Festival Supervisor

£6,800.00

      Take Measures to Solve the Risks

Event Manager, Festival Supervisor

£6,800.00

      Prepare Communication Plan

Event Manager, Festival Supervisor

£6,800.00

      Finalize the Charter

Event Manager, Festival Supervisor

£6,800.00

      Get Approval for the Charter

Event Manager, Festival Supervisor

£6,800.00

   Marketing and Promotions

 

£17,200.00

      Hire Marketing Team for the Event

Human Resource Manager

£3,600.00

      Start Marketing and Promotion of the Festival

Marketing Manager

£8,000.00

      Invite Musicians to Perform in the Festival

Marketing Manager

£4,000.00

      Invite High Profile Guests to Visit and Enjoy the Festival

Marketing Manager

£1,600.00

   Project Execution

 

£949,200.00

      Rent the Stadium for Festival

Festival Supervisor

£2,800.00

      Appoint Volunteers

Human Resource Manager

£3,600.00

      Decorate the Stadium with Lights and Banners

Other Team Workers

£200,000.00

      Install Large Sound Boxes and Field Televisions

Other Team Workers

£240,000.00

      Purchase Musical Instruments

Other Team Workers

£100,000.00

      Prepare Parking Space

Other Team Workers

£100,000.00

      Prepare Children Entertainment Area

Other Team Workers

£100,000.00

      Build Food Stalls

Other Team Workers

£40,000.00

      Build Drinks Stalls

Other Team Workers

£40,000.00

      Build Souvenir Shops

Other Team Workers

£40,000.00

      Install Safety System

Other Team Workers

£40,000.00

      Construct Entry and Exit Routes

Other Team Workers

£40,000.00

      Finalize the Project

Festival Supervisor

£2,800.00

   Event Execution and Closing

 

£57,600.00

      Host the Festival

Festival Supervisor, Volunteers

£26,800.00

      Donate Funds Raised to Charity

Event Manager

£10,000.00

      Review of the Festival

Event Manager

£10,000.00

      Final Closing

Event Manager, Festival Supervisor, Human Resource Manager, Marketing Manager

£10,800.00

Now, the costs for material resources are shown in the following table.

Activity

Expected Expenditure

Rent Fee for the Stadium

£1,500,000

Decorations, Banners, Promotions

£50,000

Seat Arrangements, Centre Stage Set Up

£50,000

White Smoke, Fireworks, Lights, Pyro

£10,000

Musical Instruments and Music Sets

£25,000

Seat Arrangements and Numbering

£5,000

Loud Speakers and Bass

£15,000

Portable Toilets, Food, Drinks and Souvenir Shops

£25,000

Installation of Safety Equipments and Emergency Camps

£15,000

Wages and Payments

£1,500,000

Payment to the Participating Music Performers and Superstars

£5,000,000

Total

£8,195,000

Hence, the final total budget of the music festival is set at approximately £10,000,000.
Awareness of Potential Risk Factors
There are certain risks associated with the festival that need to be mitigated in order to ensure the success of the festival. Some of the potential risk factors are follows.
Very High Budget – Hosting a global scale festival will consume significant amount of budget. Hence, without sufficient funding and investment, the event management team may not be able to pull off the event. Furthermore, since this festival is been hosted for the first time, the team will find it difficult to find a suitable investor.
Safety Issues – With around 1,500,000 people attending the festival per day, it is clear that there is high risk of safety issues occurring especially if the event management team is not aware of possible issues. The team must emphasize on efficient handling of the large crowd as well as make space for emergency exit for people falling sick.
Evaluation and Control of Project
The entire project will evaluated based on the performance of the festival. The performance will be judged by a number of factors including participation of the number of spectators, revenue generated, television and digital media coverage, partnership with a number of business organizations and others. Based on the evaluation of the project, it will be decided whether the festival will be repeated the next year as well.
The control of the project is required as it is a global scale festival. Various operational teams and the event manager will ensure the festival is under control and remains within the limitations of the scope.
Conclusion
This report includes a detailed event management plan for the proposed music festival in London. In order to develop various aspects of the event plan, project management tools like scope management plan, project scheduling, work breakdown structure, Gantt chart and others have been utilized. As per the initial estimations, it will take around 42 days to complete all the preparations for the event and approximately £10 million will be spent as the budget of the project.
Bibliography
Cottrill, K. and Hayashi, K., 2014. Learning Transferable Skills Through Event Planning. Experience-Driven Leader Development, pp.65-68.
Della Lucia, M., 2013. Economic performance measurement systems for event planning and investment decision making. Tourism Management, 34, pp.91-100.
Devine, L. and Moss, S., 2014. Event planning and management. Entertainment Management: Towards Best Practice, p.99.
Dowson, R. and Bassett, D., 2015. Event Planning and Management: A Practical Handbook for PR and Events Professionals. Kogan Page Publishers.
Flyvbjerg, B., 2014. Megaproject planning and management: Essential readings, vols 1-2. Edward Elgar Publishing.
Friedman, S.L. and Scholnick, E.K., 2014. The developmental psychology of planning: Why, how, and when do we plan?. Psychology Press.
Getz, D. and Page, S.J., 2016. Event studies: Theory, research and policy for planned events. Routledge.
Haines, S., 2016. The systems thinking approach to strategic planning and management. CRC Press.
Holmes, K., Nichols, G. and Ralston, R., 2018. It’s a Once-in-a-Lifetime Experience and Opportunity—Deal with it! Volunteer Perceptions of the Management of the Volunteer Experience at the London 2012 Olympic Games. Event Management, 22(3), pp.389-403.
Ittner, C.D. and Michels, J., 2017. Risk-based forecasting and planning and management earnings forecasts. Review of Accounting Studies, 22(3), pp.1005-1047.
Jepson, A. and Ryan, W.G., 2018. Applying the Motivation, Opportunity, Ability (MOA) model, and Self-Efficacy (SE) to better understand student engagement on Undergraduate Event Management Programs. Event Management, 22(2), pp.271-285.
Jones, M., 2014. Sustainable event management: A practical guide. Routledge.
Law, E.A., Bryan, B.A., Meijaard, E., Mallawaarachchi, T., Struebig, M. and Wilson, K.A., 2015. Ecosystem services from a degraded peatland of Central Kalimantan: implications for policy, planning, and management. Ecological Applications, 25(1), pp.70-87.
Lawton, L.J. and Weaver, D.B., 2015. Using residents’ perceptions research to inform planning and management for sustainable tourism: A study of the Gold Coast Schoolies Week, a contentious tourism event. Journal of Sustainable Tourism, 23(5), pp.660-682.
Mason, P., 2015. Tourism impacts, planning and management. Routledge.
Masterman, G., 2014. Strategic sports event management. Routledge.
Müller, M., 2015. The mega-event syndrome: Why so much goes wrong in mega-event planning and what to do about it. Journal of the American Planning Association, 81(1), pp.6-17.
Nazri, N.J.Z., Yasin, R.F.F., Samsudin, S. and Ahmad, S., 2018. The Development of Muslim-Friendly Event Management Standards in Malaysia for Establishment of Malaysian Shariah Index Compliance. In Proceedings of the 3rd International Halal Conference (INHAC 2016) (pp. 191-200). Springer, Singapore.
Olson, E.D. and Brown, E., 2018. Perceptions of Students in an Event Management Program of Annotation Systems and Their Influence on Student Learning. Journal of Hospitality & Tourism Education, 30(2), pp.118-126.
Prayag, G. and Grivel, E., 2018. Antecedents of Sport Event Satisfaction and Behavioral Intentions: The Role of Sport Identification, Motivation, and Place Dependence. Event Management, 22(3), pp.423-439.

Free Membership to World’s Largest Sample Bank

To View this & another 50000+ free samples. Please put
your valid email id.

E-mail

Yes, alert me for offers and important updates

Submit 

Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

UploadUnique Document

DocumentUnder Evaluation

Get Moneyinto Your Wallet

Total 15 pages

PAY 9 USD TO DOWNLOAD

*The content must not be available online or in our existing Database to qualify as
unique.

Cite This Work
To export a reference to this article please select a referencing stye below:

APA
MLA
Harvard
OSCOLA
Vancouver

My Assignment Help. (2021). Event Planning And Project Management. Retrieved from https://myassignmenthelp.com/free-samples/evnt7051-event-planning-and-project-management/a-music-festival-event-in-london.html.

“Event Planning And Project Management.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/evnt7051-event-planning-and-project-management/a-music-festival-event-in-london.html.

My Assignment Help (2021) Event Planning And Project Management [Online]. Available from: https://myassignmenthelp.com/free-samples/evnt7051-event-planning-and-project-management/a-music-festival-event-in-london.html[Accessed 18 December 2021].

My Assignment Help. ‘Event Planning And Project Management’ (My Assignment Help, 2021) accessed 18 December 2021.

My Assignment Help. Event Planning And Project Management [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/evnt7051-event-planning-and-project-management/a-music-festival-event-in-london.html.

×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}

×

Thank you for your interest
The respective sample has been mail to your register email id

×

CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.

Account created successfully!
We have sent login details on your registered email.

User:

Password:

Are you looking for the best essay writing service all over the internet? Conclude your search right here for MyAssignmenthelp.com is here to provide with the much-needed help. We understand students can’t always afford to pay a fortune for an essay with their limited and no earning. Therefore, at MyAssignmenthelp.com, we have designed a wide range of value-for-money services.  To ensure that you don’t need to think twice before hiring our services, we also offer massive discounts, lucrative packages, redeemable loyalty points and bonus all year around. You can also opt for our free essay eamples to gain relevant insights into the quality we offer. Hence, next time you wonder “Can I pay someone to write my paper?”- be sure to place an order with MyAssignmenthelp.com!

Latest Management Samples

div#loaddata .card img {max-width: 100%;
}

MPM755 Building Success In Commerce
Download :
0 | Pages :
9

Course Code: MPM755
University: Deakin University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More

SNM660 Evidence Based Practice
Download :
0 | Pages :
8

Course Code: SNM660
University: The University Of Sheffield

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration 

BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20

Course Code: BSBHRM513
University: Tafe NSW

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More

MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5

Course Code: MKT2031
University: University Of Northampton

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration 

MN506 System Management
Download :
0 | Pages :
7

Course Code: MN506
University: Melbourne Institute Of Technology

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…
Read
More
Tags:
Australia Cheltenham Computer Science Litigation and Dispute Management University of New South Wales Information Technology 

Next

Need an essay written specifically to meet your requirements?

Choose skilled experts on your subject and get an original paper within your deadline

156 experts online

Your time is important. Let us write you an essay from scratch

Tips and Tricks from our Blog

11174 Introduction To Management

Free Samples 11174 Introduction To Management .cms-body-content table{width:100%!important;} #subhidecontent{ position: relative; overflow-x: auto; width: 100%;} 11174 Introduction

Read More »