Tutor Quora

INFS4858 Managing Complex Projects

Academic Anxiety?

Get an original paper within hours and nail the task

156 experts online

Free Samples

INFS4858 Managing Complex Projects

.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}

INFS4858 Managing Complex Projects

0 Download5 Pages / 1,033 Words

Course Code: INFS4858
University: University Of New South Wales

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Question:

“The most common High level categorizations of complexity were identified as:”
Scale
Uncertainty;
Pace;
and Socio-political.
Is there a relationship between each of these and “The four categories or dimensions, which are based on the source of complexity and may constitute a tool to assist stakeholders in identifying the nature of complexity”, namely:
Structural complexity;
Technical complexity;
Directional complexity; and
Temporal complexity.
That Remington and Pollack discuss
 
In other words is:
Scale a synonym for Structural complexity?
Uncertainty a synonym for Technical complexity?
Pace a synonym for Directional complexity?
and Socio -political a synonym for Temporal complexity?
Or are the respective authors discussing something more complex and subtle? Does then the concept of Structural and Dynamic Complexity alter your initial opinion as discussed by Carver and Maylor?
Answer:

Relationship
Between Scale and Structural complexity
The scale is the size of a project which is related with the volume or the cost involvement in the project. Whereas at the same time the structural complexity is based on the channel of the flow of information which is required to be maintained to avoid increasing the level of complexity of a project. If at all in a project the reporting cycle is not proper or it is not in a lean manner then the complexity is bound to increase due to increase in the chances of miscommunication. In the referred article (Bosch-Rekveldt, Jongkind, Mooi, Bakker, & Verbraeck, 2010) on page number 3 it is written that the uncertainty is also belonged to the structural complexity. And as we know that as the size of a project increases the level of uncertainty is also increases due to the involvement of various factors and so it can be confirmed that scale of a project can be used as a synonym of the structural complexity. Again, with respect to the page number 5, it is mentioned that because of the increase in the scale of a project the scope of a project is bound to increase and so the number of deliverables also which means the number of components and the decision-making factor will increase and it will ultimately hit the structural complexity.
Between Uncertainty and Technical complexity
The uncertainty of a project belongs to the unknown factors which are included in the project. And at the same time, the technical complexity also deals with the challenges which can be faced to design the project due to the time required to develop the solution to the problem. In the article (Lukosevicius, Soares, & Jola, 2018) page number 332 and 338, it is well mentioned that the complexity of a project always increases with the uncertainty of the method of operation. In the article (Koleczko, 2012) page number 78, it is declared that for making any decisions the uncertainties related to the environment and other risk factors are required to be reduced so that the complexity can ultimately be reduced. Further to this in page number 79 also it is mentioned that to reduce the engineering complexity the uncertainty is always required to be reduced. In page number 2 of the article (Poveda-Bautista, Diego-Mas, & Leon-Medina, 2018), it is clearly noted that the technical complexity always increases with the number of the unknown factor or the increase in uncertainty. In the referred article (Johansen, Eik-Andresen, Landmark, Ekambaram, & Rolstadås, 2016) page number 5, it is mentioned that there are various categories of uncertainties ultimately lead to the increase in the risk and so increases the complexity of the project. In this case, the decision-making criteria also change and become difficult for the manager, owner, and user to take the decision. So, in this case, it is very much clear that the uncertainty or the problem is due to the unavailability of technical information and so the technical complexity increases which are uncertainty.
Between Pace and Directional complexity
From the referred book (Cooke-Davies, 2011) on page number 61, it is mentioned that the delivery time which is required to deliver the product by executing the project in comparison with the similar project is a key factor for increasing the complexity of that project. Suppose for constructing a dam 48 month were required and in a similar project, the available time is only 28 months than in that case due to the reduction in the duration of the project to deliver the product the complexity of project increases. Similarly, at the page number 34, it is clearly noted that due to unclear goal with the stakeholders the directional complexity increases because none of them understand clearly their roles and responsibilities which could have happened due to minimizing the minimum required time to plan the activities properly. So, from the argument we can conclude that even the requirement of increase in pace of a project can give rise to the complexity level of direction of completing the project.
Between Socio-political and Temporal complexity
In the referred article (Svejvig & Andersen, 2015) on page number 283 and 287, it is mentioned by the author that the Socio-Political background of the project management professionals always influence the decision-making criteria and so the ability to maintain the interpersonal relationship by the project manager will highly depend on its culture which can intern affect the complexity of the project. And at the same time, this can impact the decision-making criteria in case of a change in the environmental factors and so, in this case, the complexity of the project is bound to be affected. it is the ability of the project manager or the soft skill which can influence the stakeholders throughout the project life cycle so that the temporal complexity present did the project can be reduced as and when it is required. From this evidence, it can be concluded that even the Socio-Political factor can also be used as a synonym for the temporal complexity of a project.
References
Bosch-Rekveldt, M., Jongkind, Y., Mooi, H., Bakker, H., & Verbraeck, A. (2010). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, xx(2010), 1-12. doi:10.1016/j.ijproman.2010.07.008
Cooke-Davies, T. (2011). Aspects of complexity : managing projects in a complex world. Pennsylvania, USA: Project Management Institute.
Johansen, A., Eik-Andresen, P., Landmark, A. D., Ekambaram, A., & Rolstadås, A. (2016). Value of Uncertainty: The Lost Opportunities in Large Projects. MDPI, 6(11), 1-17. doi:10.3390/admsci6030011
Koleczko, K. (2012). Risk and uncertainty in project management decision-making. Public Infrastructure Bulletin, 1(8), 76-83. Retrieved from https://epublications.bond.edu.au/pib/vol1/iss8/13
Lukosevicius, A. P., Soares, C. A., & Jola, L. A. (2018). Characterization of complexity in engineering projects. Gest. Prod., São Carlos, 25(2), 331-342. doi:10.1590/0104-530X2957-16
Poveda-Bautista, R., Diego-Mas, J.-A., & Leon-Medina, D. (2018). Measuring the Project Management Complexity: The Case of Information Technology Projects. Hindawi, 2018, 1-19. doi:10.1155/2018/6058480
Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(1), 278-290. Retrieved from https://dx.doi.org/10.1016/j.ijproman.2014.06.004

Free Membership to World’s Largest Sample Bank

To View this & another 50000+ free samples. Please put
your valid email id.

E-mail

Yes, alert me for offers and important updates

Submit 

Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

UploadUnique Document

DocumentUnder Evaluation

Get Moneyinto Your Wallet

Total 5 pages

PAY 3 USD TO DOWNLOAD

*The content must not be available online or in our existing Database to qualify as
unique.

Cite This Work
To export a reference to this article please select a referencing stye below:

APA
MLA
Harvard
OSCOLA
Vancouver

My Assignment Help. (2021). Managing Complex Projects. Retrieved from https://myassignmenthelp.com/free-samples/infs4858-managing-complex-projects/scale-and-structural-complexity.html.

“Managing Complex Projects.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/infs4858-managing-complex-projects/scale-and-structural-complexity.html.

My Assignment Help (2021) Managing Complex Projects [Online]. Available from: https://myassignmenthelp.com/free-samples/infs4858-managing-complex-projects/scale-and-structural-complexity.html[Accessed 18 December 2021].

My Assignment Help. ‘Managing Complex Projects’ (My Assignment Help, 2021) accessed 18 December 2021.

My Assignment Help. Managing Complex Projects [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/infs4858-managing-complex-projects/scale-and-structural-complexity.html.

×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}

×

Thank you for your interest
The respective sample has been mail to your register email id

×

CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.

Account created successfully!
We have sent login details on your registered email.

User:

Password:

The best thing about MyAssignmenthelp.com is that we offer urgent assignment help for all kinds of assignment help at the same price. Our prices may change only on the basis of deadlines and the number of words required. It is fine if you have a tight budget. We have something for everyone. From reasonable service charges to attractive discounts, there are a lot of factors that contribute to the affordability of our writing service.

Latest Management Samples

div#loaddata .card img {max-width: 100%;
}

MPM755 Building Success In Commerce
Download :
0 | Pages :
9

Course Code: MPM755
University: Deakin University

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More

SNM660 Evidence Based Practice
Download :
0 | Pages :
8

Course Code: SNM660
University: The University Of Sheffield

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration 

BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20

Course Code: BSBHRM513
University: Tafe NSW

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More

MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5

Course Code: MKT2031
University: University Of Northampton

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: United Kingdom

Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration 

MN506 System Management
Download :
0 | Pages :
7

Course Code: MN506
University: Melbourne Institute Of Technology

MyAssignmentHelp.com is not sponsored or endorsed by this college or university

Country: Australia

Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…
Read
More
Tags:
Australia Cheltenham Computer Science Litigation and Dispute Management University of New South Wales Information Technology 

Next

Need an essay written specifically to meet your requirements?

Choose skilled experts on your subject and get an original paper within your deadline

156 experts online

Your time is important. Let us write you an essay from scratch

Tips and Tricks from our Blog

11174 Introduction To Management

Free Samples 11174 Introduction To Management .cms-body-content table{width:100%!important;} #subhidecontent{ position: relative; overflow-x: auto; width: 100%;} 11174 Introduction

Read More »