ITC505 Project Management For Crop Website Development
0 Download5 Pages / 1,060 Words
Course Code: ITC505
University: Charles Sturt University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Question:
Discuss the functionalities of the system and the benefits the system is set out to achieve as bullet points.
Answer:
MOV: Desired Area of Impact
Impact
Value
Metric
Timeframe
Operational
Better scheduling processing speed and operational effectiveness
Increase in speed and effectiveness by 45 and 51 percent respectively
180 days
Financial
Reduction on expenses on phone calls
Reduction by 60%
180 days
Customer
Always-on system and faster response time
Response in less than 4 hours
180 days
Strategic
Better brand value and reputation
Market shares up by 44%
180 days
Social
More number of farmers and local contributors
Increase by 33%
180 days
Values
Better: Brand Value, Brand Reputation, Scheduling Processing Speed, Operational Effectiveness
Do More: Farmers and Local Contributors
Appropriate Metric
Always-on system with 99% security of payments and reliable information exchange
Total Timeframe
Time to complete the project will be 90 days and time to accomplish the expected values defined under MOV will be 180 days.
MOV Summary
The targets will be achieved in 180 days and it will cover improvement in the Brand Value, Brand Reputation, Scheduling Processing Speed, Operational Effectiveness along with collaboration with more farmers and local contributors.
Project Scope
The scope will include the initial project activities and determination of feasibility followed by project planning and data collection. The definition of project requirements and calculation of estimations along with design and development of i-crop website will come under the scope. The testing, implementation, and closure activities will also be a part of the scope (Fageha & Aibinu, 2013).
Scope Management Plan
There will be activities executed to manage the scope of the project. The management of the scope will be essential because the risks of scope creep and inflation may appear otherwise.
The above steps will be used and executed for scope management of the project.
List of Resources
Resource Name
Type
Initials
Max. Units
Std. Rate
Kapil Kumar
Work
Project Manager
100%
$97.00/hr
Muhammad Ebrahim
Work
Project Analyst
100%
$88.00/hr
Mohammad Zeeshanuddin
Work
Technical Expert
100%
$82.00/hr
Nomula Sandeep Goud
Work
SME
100%
$90.00/hr
Tools & Equipment
Material
T
$16,300.00
High-Level WBS
A high-level work breakdown structure for i-crop website being developed by Virtucon is shown in the figure below. The website will be developed by executing several activities which have been defined and put in the phases as shown in the packages and sub-packages of the WBS.
Project Schedule – Milestones, Resources, Tasks, Budget, and Duration
The development of i-crop website will be done by the project team in a total of 90 days. Four resources as Project Manager, Project Analyst, Subject Matter Expert, and Technical Expert will perform the activities for the project. The start date of the project will be 26th September 2018 and it will end on 29th January 2019 (Zwikael, 2009). There will be costs that will be needed to give shape to the project activities. These will be in terms of the cost of resources, development costs, resource costs, and others. A detailed schedule, milestones, resource assignment, and budget have been shown below.
Assumptions for the Project
The costs that have been estimated for the project along with the duration estimated for each project activity.
The availability of the team member on the dates assigned.
Risk Analysis & Plan
Risk Name
Phase
Summary
Resource
Strategy
Operational Issues
Initiation
The feasibility determination may not be adequately conducted due to operational inefficiencies.
Kapil Kumar
Risk Avoidance
Incorrect Estimations
Planning
Estimates for the project may be incorrectly calculated and determined (Peixoto, Tereso, Fernandes & Almeida, 2014)
Muhammad Ebrahim
Risk Avoidance
Security Loopholes in the code
Execution
The code of the website may have loopholes that may welcome security attacks.
Mohammad Zeeshanuddin
Risk Mitigation & Avoidance
Schedule/Budget Overrun – Gaps during review
Control
The project reviews may show increased schedule or cost variance.
Nomula Sandeep Goud
Risk Avoidance
Non-adherence to quality
Closure
Quality standards may not be followed (Sanchez, Robert, Bourgault & Pellerin, 2009)
Kapil Kumar
Risk Avoidance
Quality Management Plan
Quality Statement
The website quality and the project quality will be managed using ISO 9001:2008 as the quality standard.
Verification and Validation Activities
Varied testing types, such as website usability evaluation, website interaction evaluation, website responsiveness evaluation, functional, and non-functional testing will be done (Milunovic & Filipovic, 2013).
Nomula Sandeep Goud and Kapil Kumar will conduct supervisor reviews for understanding and identify any gaps in quality.
Annotated Bibliography
Closure Checklist
Documentation: The website will be required to be provided with detailed documentation covering user guides, manual, and support documents.
Financial Checks: The cost variance of the website development project shall be determined using Earned Value Management (EVM) as the tool and the result shall be zero or negligible (Lenfle, 2012).
Schedule Checks: The schedule variance of the website development project shall be determined using Earned Value Management (EVM) as the tool and the result shall be zero or negligible
Deliverables: The project had several deliverables that had a due date assigned to them. The submission of the deliverables as per the due date and inclusion of the contents in the deliverables as per the requirement shall be evaluated (Zohrehvandi, Khalilzadeh, Hajizadeh & Cheraghi, 2017).
Open Issues: The presence of open defects, issues, problems, and conflicts may prove to be negative for the project and the open issues must not be present (Zidane, Johansen & Ekambaram, 2015).
References
Fageha, M., & Aibinu, A. (2013). Managing Project Scope Definition to Improve Stakeholders’ Participation and Enhance Project Outcome. Procedia – Social And Behavioral Sciences, 74, 154-164. doi: 10.1016/j.sbspro.2013.03.038
Lenfle, S. (2012). Exploration, project evaluation and design theory: a rereading of the Manhattan case. International Journal Of Managing Projects In Business, 5(3), 486-507. doi: 10.1108/17538371211235335
Milunovic, S., & Filipovic, J. (2013). Methodology for quality management of projects in manufacturing industries. Total Quality Management & Business Excellence, 24(1-2), 91-107. doi: 10.1080/14783363.2012.728851
Peixoto, J., Tereso, A., Fernandes, G., & Almeida, R. (2014). Project Risk Management Methodology: A Case Study of an Electric Energy Organization. Procedia Technology, 16, 1096-1105. doi: 10.1016/j.protcy.2014.10.124
Sanchez, H., Robert, B., Bourgault, M., & Pellerin, R. (2009). Risk management applied to projects, programs, and portfolios. International Journal Of Managing Projects In Business, 2(1), 14-35. doi: 10.1108/17538370910930491
Zidane, Y., Johansen, A., & Ekambaram, A. (2015). Project Evaluation Holistic Framework – Application on Megaproject Case. Procedia Computer Science, 64, 409-416. doi: 10.1016/j.procs.2015.08.532
Zohrehvandi, S., Khalilzadeh, M., Hajizadeh, M., & Cheraghi, E. (2017). Planning project closure phase in combined cycle power plant projects. Procedia Computer Science, 121, 274-281. doi: 10.1016/j.procs.2017.11.038
Zwikael, O. (2009). The Relative Importance of the PMBOK® Guide’s Nine Knowledge Areas during Project Planning. Project Management Journal, 40(4), 94-103. doi: 10.1002/pmj.20116
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 5 pages
PAY 3 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2021). Project Management For Crop Website Development. Retrieved from https://myassignmenthelp.com/free-samples/itc505-ict-project-management/project-team.html.
“Project Management For Crop Website Development.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/itc505-ict-project-management/project-team.html.
My Assignment Help (2021) Project Management For Crop Website Development [Online]. Available from: https://myassignmenthelp.com/free-samples/itc505-ict-project-management/project-team.html[Accessed 18 December 2021].
My Assignment Help. ‘Project Management For Crop Website Development’ (My Assignment Help, 2021)
My Assignment Help. Project Management For Crop Website Development [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/itc505-ict-project-management/project-team.html.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
Paraphrasing is a convenient way to avoid plagiarism issues in your assignments. However, if you are not aware of how to pull this off, it is ideal that you seek the essay help of the experts at MyAssignmnethelp.com. Years of experience provide our experts with an edge over novice writers in avoiding plagiarism. Our experts resort to powerful paraphrase tools to provide you with genuine content. Thus, you receive online paraphrasing assistance without any traces of plagiarism. MyAssignmenthelp.com even has its own paraphrasing tool which is available online.
Latest Management Samples
div#loaddata .card img {max-width: 100%;
}
MPM755 Building Success In Commerce
Download :
0 | Pages :
9
Course Code: MPM755
University: Deakin University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More
SNM660 Evidence Based Practice
Download :
0 | Pages :
8
Course Code: SNM660
University: The University Of Sheffield
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration
BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20
Course Code: BSBHRM513
University: Tafe NSW
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More
MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5
Course Code: MKT2031
University: University Of Northampton
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration
MN506 System Management
Download :
0 | Pages :
7
Course Code: MN506
University: Melbourne Institute Of Technology
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…