Free Samples
PROJ6011 Integrated Infrastructure Project Management
.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}
PROJ6011 Integrated Infrastructure Project Management
0 Download6 Pages / 1,335 Words
Course Code: PROJ6011
University: Laureate International Universities
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United States
Question:
For this assessment and adopts a case study approach and focuses on the implementation and decommissioning phases of an integrated infrastructure project.
Draft report which includes an introduction and the section which outlines and addresses the project life cycle.
Answer:
Infrastructure Project Case Study – Performance and Sustainability On Brampton Civic Hospital
Introduction
The report aims at providing a better lifecycle for the Brampton Civic Hospital. The hospital has implemented all new technologies in order to provide better treatment towards their patients. The report will focus on building a proper infrastructure project lifecycle for the hospital. This becomes very much necessary to understand and control the processes taking place within the hospital. In the second part of the report the importance of building high performance team will be described (Rahman & Kumaraswamy, 2008). Third part of the report will emphasise on the asset maintenance and sustainability based management that are necessary to complete the lifecycle. The fourth part will describe the need for safety and security within the hospital. Lastly the report will provide a reflection based on the developed report.
Background of Brampton Civic Hospital
Brampton Civic hospital aims at building up a public hospital that will be accessible for everyone. The hospital has included new infrastructure with emerging technologies for providing better service to the patients (Goodman & Hastak, 2006). The project is set to be implemented in Brampton city Canada. This is Canada’s first public hospital. The total expected area required to complete this project is 1.2 million sq. ft. and will include 608 beds and 108 rooms for operation purposes.
Discussion
The report is going to discuss about the implementation and decommissioning phases that are important for this case study. The Brampton civic hospital case study will be used to determine the requirements that are necessary for developing a project life cycle. This is essential to understand the need for controlling the process, determining the quality management and maintain the supply chain management. This is necessary for the project leader to understand the quality that is needed to be maintained while developing this project (Ormazabal, Viñolas & Aguado, 2008). The risks that are likely to come along with the implementation of this projects are needed to be addressed. The major risk that are likely to come along with the implementation of this case study is the cost overflow. The cost in managing the technology used will be huge and thus will affect the hospital. Apart from this, the hospital needs to hire employees accordingly, so that they can operate the new technology properly. In order to manage the project function it is necessary to develop a proper plan.
Infrastructure project life cycle
Before planning a project it becomes necessary to understand the infrastructure life cycle of the project. There is a need to understand the approach towards the project from a leader point of interview. This will help to develop a better quality and will help to serve maximum benefit towards their patients. It is necessary to mitigate the risk and manage perfect planning so that the hospital does not faces problem in future. The main risks that are associated with the implementation of this project is that the handling of new equipment’s (Martland, 2012). Moreover in implementing this technology the money required will be more. This is necessary to understand that in order to improve the processing of the lifecycle, it is necessary to have employees and staffs who will be able to operate every instrument well.
Managing Infrastructure project performance
Brampton Civic Hospital is being developed with the aim of providing better facility and is open to all. The report will focus on the performance definition. This is necessary to understand the performance after implementing new technology (Creedy, Skitmore & Wong, 2010). The procurement project plan includes planning the type of contract and any metric that will be beneficial to determine performance of the contract. The project manager needs to set a date for delivering the product and the company will use their standard document to continue the procurement plan. Apart from all these there is a great importance of building a good team. As good team will lead to successful completion of this project.
Asset management and sustainability
In order to successfully complete the commission steps the organization needs to follow certain steps that includes start early, meet often, maximizing the training and finally the organization needs to keep commissioning involved (Sánchez Soliño & Vassallo, 2009). Once the contract is prepared and the organization is ready to start with the project, it is necessary to get all the documents signed off from each stakeholders and employees. In case any employee or stakeholders need to change any plan they can suggest it before signing off these documents. This is necessary to determine the challenges that are likely to be faced with the implementation of these changes in the infrastructure.
Infrastructure project security and safety
The report needs to assess in details the operational issues that are likely to be faced with the implementation of these project. Moreover their lies some safety and security issues that are needed to be identified and mitigated. The main issues is that the equipment’s need to be handled with care so that it can perform perfectly (Accenture, 2012).
Reflection
From the above report I can conclude that it becomes essential to manage the infrastructure and prepare security strategies that will help in completing the project successfully. This is necessary to include safety and security considerations from both point of view that is from contractor and from user point of view.
Conclusion
From the above report it can be concluded that there is a need to focus on implementation and decommissioning phases for performing the integrated infrastructure project. The report has critically analysed the project life cycle, in managing the asset, for performing the project and for maintaining the security.
References
Accenture (2012). Intelligent Urban Infrastructure: High Performance Platform for Urban Development. Retrieved from https://www.accenture.com/t20150523T043119__w__/us-en/_acnmedia/Accenture/Conversion-Assets/DotCom/Documents/Global/PDF/Industries_4/Accenture-Intelligent-Urban-Infrastructure.pdf#zoom=50
Creedy, G. D., Skitmore, M., & Wong, J. K. W. (2010). Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), 528–537. From TUA library databases. https://ezproxy.laureate.net.au/login?url=https://search.ebscohost.com/login.aspx?direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.225313920&site=eds-live&scope=site
Goodman, A. S., & Hastak, M. (2006). Infrastructure planning handbook: Planning, engineering, and economics, New York, NY: ASCE Press. Reprinted by permission of American Society of Civil Engineers via the Copyright Clearance Center. Chapter 5, “Municipal Infrastructure Systems: Performance and Prioritization”
Martland, C. D. (2012). Chapter 5 (Sec 5.1)
Ormazabal, G., Viñolas, B., & Aguado, A. (2008). Enhancing value in crucial decisions: Line 9 of the Barcelona subway. Journal of Management in Engineering, 24(4), 265–272. From TUA library databases. https://ezproxy.laureate.net.au/login?url=https://search.ebscohost.com/login.aspx?direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.186516397&site=eds-live&scope=site
Rahman, M. M., & Kumaraswamy, M. M. (2008). Relational contracting and teambuilding: Assessing potential contractual and non-contractual incentives. Journal of Management in Engineering, 24(1), 48–63. From TUA library databases. https://ezproxy.laureate.net.au/login?url=https://search.ebscohost.com/login.aspx?direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.173021111&site=eds-live&scope=site
Sánchez Soliño, A., & Vassallo, J. M. (2009). Using public-private partnerships to expand subways: Madrid-Barajas International Airport case study. Journal of Management in Engineering, 25(1), 21–28. From TUA library databases. https://ezproxy.laureate.net.au/login?url=https://search.ebscohost.com/login.aspx?direct=true&AuthType=ip,url,uid&db=bth&AN=35745912&site=eds-live&scope=site
Song, L., Mohamed, Y., & AbouRizk, S. M. (2009). Early contractor involvement in design and its impact on construction schedule performance. Journal of Management in Engineering, 25(1), 12–20. From TUA library databases. https://ezproxy.laureate.net.au/login?url=https://search.ebscohost.com/login.aspx?direct=true&AuthType=ip,url,uid&db=edsgao&AN=edsgcl.191855321&site=eds-live&scope=site
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 6 pages
PAY 4 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2021). Integrated Infrastructure Project Management. Retrieved from https://myassignmenthelp.com/free-samples/proj6011-integrated-infrastructure-project-management/study-on-brampton-civic-hospital.html.
“Integrated Infrastructure Project Management.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/proj6011-integrated-infrastructure-project-management/study-on-brampton-civic-hospital.html.
My Assignment Help (2021) Integrated Infrastructure Project Management [Online]. Available from: https://myassignmenthelp.com/free-samples/proj6011-integrated-infrastructure-project-management/study-on-brampton-civic-hospital.html[Accessed 18 December 2021].
My Assignment Help. ‘Integrated Infrastructure Project Management’ (My Assignment Help, 2021)
My Assignment Help. Integrated Infrastructure Project Management [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/proj6011-integrated-infrastructure-project-management/study-on-brampton-civic-hospital.html.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
Citation becomes a hassle, especially when you have more than one sources to refer to for creating your research paper. We provide you information on how to write a lookup paper, supply you with ans ideal research paper outline, excellent research paper topics. We also assist you with writing a research proposal and various research undertaking ideas. We strictly adhere to the instructions and conventions. Owing to our stringent focus on paper quality and deadline, we are one of the best paper writing services in the industry.
Latest Management Samples
div#loaddata .card img {max-width: 100%;
}
MPM755 Building Success In Commerce
Download :
0 | Pages :
9
Course Code: MPM755
University: Deakin University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More
SNM660 Evidence Based Practice
Download :
0 | Pages :
8
Course Code: SNM660
University: The University Of Sheffield
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration
BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20
Course Code: BSBHRM513
University: Tafe NSW
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More
MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5
Course Code: MKT2031
University: University Of Northampton
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration
MN506 System Management
Download :
0 | Pages :
7
Course Code: MN506
University: Melbourne Institute Of Technology
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…
Read
More
Tags:
Australia Cheltenham Computer Science Litigation and Dispute Management University of New South Wales Information Technology
Next